Tubo Chiodato ASTM A106 GR.B in Acciaio al Carbonio Senza Saldatura per Tubi Radianti in Forno

Metropolitana fissata
July 27, 2025
Connessione Categoria: Metropolitana fissata
Brief: Discover the ASTM A106 GR.B Studded Tube Carbon Steel Seamless Pipe, designed for radiant tubes in high-temperature furnaces. This product enhances heat transfer in petrochemical furnaces and reformers, offering durability and efficiency in extreme conditions.
Related Product Features:
  • Made from ASTM A106 Grade B carbon steel for high-temperature furnace applications.
  • Features studs with a fin height of 8mm to 25.4mm for enhanced heat transfer.
  • Imballato in casse di legno multistrato con telai in ferro per un trasporto sicuro.
  • Undergoes HT and ECT non-destructive testing for quality assurance.
  • Studs are welded using high-frequency welding for strong bonding.
  • Resistant to fouling and ideal for gas-side heat transfer.
  • Meets mechanical properties including tensile strength ≥ 415 MPa and yield strength ≥ 240 MPa.
  • Commonly used in petrochemical heaters, reformers, and ethylene crackers.
Domande frequenti:
  • What is the base material of the ASTM A106 GR.B Studded Tube?
    The base material is ASTM A106 Grade B carbon steel, known for its durability and performance in high-temperature environments.
  • Come sono fissati i prigionieri al tubo?
    I puntini sono fissati con saldatura ad alta frequenza, garantendo un legame forte e durevole tra il puntino e il tubo.
  • What are the typical applications of this studded tube?
    This studded tube is commonly used in radiant sections of petrochemical furnaces, reformers, crude heaters, and ethylene crackers, where high heat flux and gas exposure occur.
Video correlati

Pinna con borchie

Metropolitana fissata
July 08, 2024

YUHONG HOLDING GROUP

YUHONG HOLDING GROUP - Ufficio
June 18, 2024

Tubo a pinna bassa

Tubo a pinna bassa
July 08, 2024

Metropolitana di aletta espelsa

Metropolitana di aletta espelsa
July 08, 2024

YUHONG GROUP ATTIVITA' DI CREACIONE DEL TEAM 2024.11

TEAM BUILDING DEL GRUPPO YUHONG
December 04, 2024

Tubo G Fin incorporato

Tubo G Fin incorporato
July 08, 2024

PROCESSO DEL TUBO FINALE HFW DEL GRUPPO YUHONG

Tubo a pinna di saldatura ad alta frequenza
November 25, 2024

Tubo G Fin incorporato

Tubo G Fin incorporato
August 02, 2025