ASME SA192 Tubo a pinne in acciaio al carbonio a strisce serrate CS Fin Strip per riscaldatori a fuoco

Metropolitana fissata
July 18, 2025
Connessione Categoria: Metropolitana alettata seghettata
Brief: Discover the ASME SA192 Carbon Steel Fin Tube with Serrated CS Fin Strip, designed for high-efficiency heat transfer in fired heaters. This durable and cost-effective solution is perfect for high-temperature applications in oil, gas, and power industries.
Related Product Features:
  • Base tube made of ASME SA192 Carbon Steel, ideal for high-pressure and high-temperature environments.
  • La striscia serrata di acciaio al carbonio (CS) migliora il trasferimento di calore creando turbolenze.
  • Designed for fired heaters, ensuring efficient thermal performance in industrial settings.
  • Customizable outer diameter (19.05 mm - 114.3 mm) and fin height (15 mm - 45 mm).
  • High-temperature resistance with tensile strength of 415 - 535 MPa for the base tube.
  • Cost-effective solution combining durability and superior heat transfer efficiency.
  • Suitable for heat exchangers, boilers, and industrial heating systems.
  • Corrosion-resistant and mechanically robust for long-term performance.
Domande frequenti:
  • What is the primary application of the ASME SA192 Carbon Steel Fin Tube?
    It is primarily used in fired heaters for industries like oil and gas refining, petrochemical plants, and power generation due to its high-temperature and high-pressure resistance.
  • How does the serrated fin design improve heat transfer?
    The serrated fin design increases the surface area and disrupts airflow, creating turbulence that enhances heat exchange efficiency.
  • Quali sono i vantaggi dell'utilizzo dell'acciaio al carbonio per le alette di raffreddamento?
    L'acciaio al carbonio offre resistenza, durata ed economicità, oltre a eccellenti proprietà di trasferimento del calore, rendendolo ideale per applicazioni industriali esigenti.
Video correlati

Pinna con borchie

Metropolitana fissata
July 08, 2024

YUHONG HOLDING GROUP

YUHONG HOLDING GROUP - Ufficio
June 18, 2024

Tubo a pinna bassa

Tubo a pinna bassa
July 08, 2024

Metropolitana di aletta espelsa

Metropolitana di aletta espelsa
July 08, 2024

YUHONG GROUP ATTIVITA' DI CREACIONE DEL TEAM 2024.11

TEAM BUILDING DEL GRUPPO YUHONG
December 04, 2024

Tubo G Fin incorporato

Tubo G Fin incorporato
July 08, 2024

PROCESSO DEL TUBO FINALE HFW DEL GRUPPO YUHONG

Tubo a pinna di saldatura ad alta frequenza
November 25, 2024

Tubo G Fin incorporato

Tubo G Fin incorporato
August 02, 2025