Grupo YUHONG Holding

Grupo YUHONG HOLDING - Escritório
June 18, 2024
Categoria Conexão: Tubos de barbatana sólida
Brief: Discover YUHONG HOLDING GROUP's Stainless Steel Longitudinal High Frequency Welded Finned Tubes, designed for enhanced heat transfer solutions in industrial applications. These tubes offer superior performance, durability, and customization options to meet your specific project needs.
Related Product Features:
  • Continuous longitudinal fin welding ensures superior thermal conductivity.
  • Excellent fin-to-tube bonding strength for long-lasting performance.
  • Uniform fin spacing maximizes heat transfer efficiency.
  • High pressure resistance suitable for demanding industrial environments.
  • Extended heat transfer surface area improves overall system performance.
  • Disponível em diversos materiais, incluindo aço carbono, aço inoxidável e alumínio.
  • Compliant with ASME, ASTM, ISO 9001:2015, and PED 2014/68/EU standards.
  • Dimensões e especificações personalizáveis para atender às necessidades específicas do projeto.
Perguntas frequentes:
  • What are the material options for the base tube and fins?
    The base tube can be made from carbon steel (SA179, SA192), stainless steel (304/304L, 316/316L), or low-alloy steel (T11, T22). Fins are available in carbon steel, stainless steel, or aluminum.
  • What are the typical applications for these finned tubes?
    These tubes are used in power generation boilers, heat recovery steam generators (HRSG), industrial heat exchangers, air coolers, process cooling systems, and chemical processing equipment.
  • What quality assurance measures are in place?
    YUHONG HOLDING GROUP conducts 100% hydrostatic testing, radiographic examination, ultrasonic testing, fin-to-tube bond strength testing, and dimensional inspection to ensure top-quality products.
Vídeos relacionados

Tubo de barbatana baixa

Tubo de barbatana baixa
July 08, 2024

Tubo de aleta expulso

Tubo de aleta expulso
July 08, 2024

Atividades de construção de equipas do Grupo YUHONG 2024.11

Construção de equipas do Grupo YUHONG
December 04, 2024

Tubo G Fin incorporado

Tubo G Fin incorporado
July 08, 2024

Processo do tubo de pinça HFW do grupo YUHONG

Tubos de barbatanas de soldagem de alta frequência
November 25, 2024

Tubo G Fin incorporado

Tubo G Fin incorporado
August 02, 2025

REPARO DE TUBO FIN DO GRUPO YUHONG 241014

Tubo G Fin incorporado
November 22, 2024