TABUNG SIRIP BERGEREK HFW GROUP YUHONG

Tabung Sirip Pengelasan Frekuensi Tinggi
December 12, 2024
Koneksi Kategori: Tabung bersirip bergerigi
Brief: Discover Yuhong Holding Group's ASTM A312 TP304H High-Efficiency Serrated Finned Tubes, designed for industrial heaters. Featuring advanced HF welding technology, these tubes deliver superior heat transfer and durability in demanding environments.
Related Product Features:
  • Constructed from ASTM A312 TP304H stainless steel for enhanced high-temperature performance.
  • High-frequency welding ensures a seamless bond between fins and base tube.
  • Serrated fin design increases turbulence, boosting heat transfer by up to 40%.
  • Excellent corrosion resistance for long service life in harsh conditions.
  • Customizable sizes, fin pitches, and configurations to meet specific needs.
  • Pengoperasian yang andal pada suhu hingga 800°C.
  • Ideal for industrial heaters, heat exchangers, HVAC systems, and waste heat recovery.
  • Manufactured by a top 5 finned tube exporter with 20 years of global experience.
Pertanyaan Umum:
  • What is the maximum operating temperature of these tubes?
    These tubes can operate reliably up to 800°C, depending on the application and load conditions.
  • Do you offer customized fin dimensions?
    Yes, we provide fully customized fin dimensions, pitches, and tube lengths to fit your unique project needs.
  • What industries are these finned tubes suitable for?
    They are ideal for petrochemical plants, power generation facilities, large commercial HVAC systems, and waste heat recovery units.
Video terkait

YUHONG GROUP Proses tabung sirip HFW

Tabung Sirip Pengelasan Frekuensi Tinggi
November 25, 2024

TABUNG SIRIP HFW KELOMPOK YUHONG

Tabung Sirip Pengelasan Frekuensi Tinggi
November 22, 2024

KELOMPOK PEMEGANG YUHONG

YUHONG HOLDING GROUP - Kantor
June 18, 2024

Tabung sirip rendah

Tabung sirip rendah
July 08, 2024

Tabung Sirip Bertabur

Tabung bertabur
July 08, 2024

Tabung Sirip Ekstrusi

Tabung Sirip Ekstrusi
July 08, 2024

YUHONG GROUP Kegiatan Pembangunan Tim 2024.11

PEMBANGUNAN TIM KELOMPOK YUHONG
December 04, 2024

Tabung G Fin yang tertanam

Tabung G Fin yang tertanam
July 08, 2024

Tabung G Fin yang tertanam

Tabung G Fin yang tertanam
August 02, 2025