Tabung Sirip Ekstrusi

Tabung Sirip Ekstrusi
July 08, 2024
Brief: Discover the high-performance Extruded Fin Tube, featuring ASTM A179 Seamless Tube with AL 1060, designed for air coolers and cooling towers. With a daily capacity of 8000 meters, this product is ideal for heat exchangers in power plants, corrosive systems, and petrochemical industries. Learn about its specifications, manufacturing process, and competitive advantages.
Related Product Features:
  • Kapasitas produksi harian hingga 8000 meter dengan 10 mesin finning.
  • Maximum tube OD of 50.8mm (2'') and length of 18,000mm.
  • Fin height up to 16.5mm and thickness ranging from 0.4mm to 0.6mm.
  • Fin pitch as low as 2.1mm (12FPI) for efficient heat transfer.
  • Surface protection with Zinc or Aluminum metalized coating on tube ends.
  • Complies with API Standard 661 and TDC delivery conditions.
  • Suitable for high wall temperatures up to 350°C.
  • Tersedia dalam berbagai bahan termasuk baja karbon, baja tahan karat, dan tembaga.
Pertanyaan Umum:
  • What are the common applications of Extruded Fin Tubes?
    Extruded Fin Tubes are used in heat exchangers for power plants, corrosive systems, petroleum, chemical, petrochemical industries, food processing, refrigeration, and natural gas treatment.
  • What materials are used for the core tube and fins?
    Core tubes can be made from carbon steel, stainless steel, brass, copper, or nickel alloys, while fins are typically made from aluminum (Alu.1100, Alu.1060) or copper.
  • What are the delivery conditions for the Extruded Fin Tube?
    Tube ends are square cut, burr-free, internally dried, and externally coated with varnish. Desiccants are included in each package for continental transportation.
Video terkait

KELOMPOK PEMEGANG YUHONG

YUHONG HOLDING GROUP - Kantor
June 18, 2024

Tabung sirip rendah

Tabung sirip rendah
July 08, 2024

Tabung Sirip Bertabur

Tabung bertabur
July 08, 2024

YUHONG GROUP Kegiatan Pembangunan Tim 2024.11

PEMBANGUNAN TIM KELOMPOK YUHONG
December 04, 2024

Tabung G Fin yang tertanam

Tabung G Fin yang tertanam
July 08, 2024

YUHONG GROUP Proses tabung sirip HFW

Tabung Sirip Pengelasan Frekuensi Tinggi
November 25, 2024

Tabung G Fin yang tertanam

Tabung G Fin yang tertanam
August 02, 2025

PERBAIKAN TABUNG SIRIP YUHONG GROUP 241014

Tabung G Fin yang tertanam
November 22, 2024